Cherub Commission. X
22 April, 2012 – 5:47 pmWell here they are, I still have to carve the inscription and shape the stone blocks.
The inscription will be carved on a sunken panel. You will notice a hole under the hands at the front, this is to drain off the water that would otherwise pool.
I may put a lead spout so that the water is thrown away from the front of the stone. That’s it so far, there is probably another 2 weeks work I will put a post up when the whole thing is completed.
Thank-you very much for reading.